{"id":123,"date":"2019-01-19T17:17:14","date_gmt":"2019-01-19T17:17:14","guid":{"rendered":"https:\/\/graceamazingly.wordpress.com\/?p=123"},"modified":"2019-01-19T17:17:14","modified_gmt":"2019-01-19T17:17:14","slug":"time-for-action","status":"publish","type":"post","link":"https:\/\/elts.org.uk\/ga\/2019\/01\/19\/time-for-action\/","title":{"rendered":"Time for action"},"content":{"rendered":"\n<p>During the reconstruction, access for the Scout group to their room will be severely restricted. We should find out more about details \u2013 perhaps the workers can allow access for a day a week for the Scout group. The project manager can get feedback very soon so Scout activities are not affected.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"alignright is-resized\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/talk-2076968_640.png\" alt=\"\" class=\"wp-image-124\" width=\"320\" height=\"277\" srcset=\"https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/talk-2076968_640.png 640w, https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/talk-2076968_640-300x259.png 300w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/figure><\/div>\n\n\n\n<p>Construction will start in a month.<\/p>\n\n\n\n<p>Another uncertainty is raised by someone who has been\nassisting with the garden for some time, and her concern was that the\nimpression is that much of the garden will not be accessible and so it will not\nbe maintained. The project manager motioned if the gardener had concerns or\nqueries, and so he said his concern was that the access to the back of building\nwill not be available during the construction work, whether to maintain the back\nof the building, services at the back, or the garden.<\/p>\n\n\n\n<p>Further feedback from hirers show that they are happy to continue using our halls along with the use of the kitchen, and everyone is excited about the prospect of using the new kitchen. A hirer said although his group does not need the kitchen, improving the kitchen facilities is a major project and shows the church takes hall hiring very seriously to contribute positively to all the communities.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"640\" height=\"426\" src=\"https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/bell-pepper-569070_640.jpg\" alt=\"\" class=\"wp-image-125\" srcset=\"https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/bell-pepper-569070_640.jpg 640w, https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/bell-pepper-569070_640-300x200.jpg 300w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p>A lot of thinking, discussion, consultation and planning had been done. It\u2019s time for the action, about to start in weeks.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"alignleft is-resized\"><img decoding=\"async\" src=\"https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/construction-site-1359136_640.jpg\" alt=\"\" class=\"wp-image-126\" width=\"320\" height=\"240\" srcset=\"https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/construction-site-1359136_640.jpg 640w, https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/construction-site-1359136_640-300x225.jpg 300w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/figure><\/div>\n\n\n\n<p>Feedback from the floor specialist said they will find us the\ncontact for another supplier who can provide floors that match closely with the\nexisting floor material in the adjacent hallway and main hall, which this\nspecialist is unable to do. We then discussed about balance of design and the\nproject agreed to take proposals from the various suppliers so that at the next\nmeeting we can decide on the design of the floor, windows, doors and walls.\nBecause orders for the doors had already been placed, the project manager will\nurgently deal with this to see best way forward.<\/p>\n\n\n\n<p>A report was due for electricity supply and is incomplete\nfor reporting at the meeting; but we have some update, that installation of a\nswitchboard will be straightforward since a number of positions are available\nand there is space in each option.<\/p>\n\n\n\n<p>There is a lot achieved in this meeting, but also a lot still to do. It is going in the right direction. <\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/kitchen-1745692_640.png\" alt=\"\" class=\"wp-image-127\" width=\"320\" height=\"320\" srcset=\"https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/kitchen-1745692_640.png 640w, https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/kitchen-1745692_640-150x150.png 150w, https:\/\/elts.org.uk\/ga\/wp-content\/uploads\/2019\/01\/kitchen-1745692_640-300x300.png 300w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/figure><\/div>\n","protected":false},"excerpt":{"rendered":"<p>During the reconstruction, access for the Scout group to their room will be severely restricted. We should find out more about details \u2013 perhaps the workers can allow access for a day a week for the Scout group. The project manager can get feedback very soon so Scout activities are not affected. Construction will start [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":125,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[],"class_list":{"0":"post-123","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-others","8":"czr-hentry"},"_links":{"self":[{"href":"https:\/\/elts.org.uk\/ga\/wp-json\/wp\/v2\/posts\/123","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/elts.org.uk\/ga\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/elts.org.uk\/ga\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/elts.org.uk\/ga\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/elts.org.uk\/ga\/wp-json\/wp\/v2\/comments?post=123"}],"version-history":[{"count":0,"href":"https:\/\/elts.org.uk\/ga\/wp-json\/wp\/v2\/posts\/123\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/elts.org.uk\/ga\/wp-json\/wp\/v2\/media\/125"}],"wp:attachment":[{"href":"https:\/\/elts.org.uk\/ga\/wp-json\/wp\/v2\/media?parent=123"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/elts.org.uk\/ga\/wp-json\/wp\/v2\/categories?post=123"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/elts.org.uk\/ga\/wp-json\/wp\/v2\/tags?post=123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}